what are the differences between opc cement and ppc cement in
applications?
Answer Posted / guru
opc cement is used for RCC structures where early strength is required. ppc is also used for RCC structures but achieving strength is longer compared to opc. It is suitable for brickwork, plastering work.
| Is This Answer Correct ? | 5 Yes | 2 No |
Post New Answer View All Answers
PCC Road Min Grade M 30 for VR standard Mahatashtra load 30 KN. what should be thickness of pavement, width 4m what should be length of panel.
what is constat for brickwork
what is the cost difference of a same structure when it is constructed with brick masonary and when it is constructed with block masonary and concrete as a frame structure????????????????????????
What should be the maximum allowable time for placing ready mix concrete? The specification requires concrete placement within 90 minutes of batching at the plant. What is the significance of this 90 minutes & should this be used as a rejection criterion? What effects does the concrete has after that time period?
we want build 10ft height ,tostore 4 litresof water.what is theground basement for steel andcement andsand.please send us basment calculation?
Suggest how many column, beem, etc required for 30 mtrs x 21 mtrs width x 8mtrs height for industrial shed of ground floor. I want to know the quantity of tmt steel consumption and Concrete consumption for budgeting
how we calculate the grade of the Bituminous materials.?????
WHAT R THE GENERAL TECH QUESTIONS ASKED FOR THE INTERVIEW FOR AN AUTOMOBILE INDUSTRY,SPECIALLY DESIGN DEPT
can we compare the combined core of DBM and BC density with average density of Lab DBM and Lab BC density
How to calculate Acctually Brickwork Quantity in Honey Comb Brick in circular Soak Pit
How many are the types of joints?
If we don't have drawing for Excavation of building,At what rule we will go for excavation and how much depth will go for a villa?
What is an object snap mode?
why we provide bent up reinforcement bars at l/4 ? if it is because of diagonal shear , how does it acts ?
My daily concrete volume of M25 concrete is 1st day= 25 Cum 2nd Day = 45 Cum 3rd Day = 55 Cum 4th Day = 22 Cum 5th Day =72 Cum 7th Day = 49 Cum. What will be acceptance criteria of concrete considering as per is 456 cl.15 and table 11 (cl 16.1 and 16.3).