Answer Posted / br kumar
slump in simple words is 'subsidence'. in other words, it is one of the measures for knowing the workability(the ease with which we transport, place/pour and compact)of concrete. i.e. more slump= more workable (user friendly) mix &
less slump = less workable(user difficult)mix.
| Is This Answer Correct ? | 3 Yes | 0 No |
Post New Answer View All Answers
why we use for testing of compression strength concrete the size of specimen 150x150x150. why we are not using another dimension like 100x150x100 uneven dimension.
do we decide reinforcement steel , based on bending moment ? give example with continous slab?
What is Critical path in Ms-Project ?
How to measure the requirement of cement n sand for 12mm and 20mm plastering thanks in advance
In the design of bridge arguments what considerations should be made to select the orientation of the wing walls?
how will calculate 4"thick solid block quantities 1m3 sand cement ratio and breack up detail
What are the causes of building collapse?
how to calculate the chair reinforcement length in slabs, footing or anywhere??
What is the standard rate of installing ties for column(60cmx60cm) and beams(50x850)(weight)
What is the quantity of cement used for stone pitching work of 100sqm 225mm thick and cement mortar of 1:6? And how?
what is the 0 value in quantity surveying
what pressure the NP2 class RCC pipe can sustain?
What is the difference in painting using Roller and Brush? What is the paint consumption difference? As per IS one coat of painting is painting from left to right and top to bottom whether this can be done using roller ( Roller Stick height and feasibility) ?
how to calculate labour strength for work for RCC,brickwork,blockwork,in &out plaster,flooring,dado,door frame & shutter,painting etc for constructing highrise building?
please send latest placement papers of hpcl officers trainee test. i will be very thankful to you.