Can we connect two or more energy meters/Amp meters on one
CT set(Three phase).

Answer Posted / abhishek pathak

ya why not. Actually always current is flow in series you put on one wire from ct s1 and connect on first energy meter s1 and put on one wire from s2 of first energy meter connect on s1 of second energy meter and second energy meters s2 connect on ct's s2. Then your current path become OK and there will be same rating in twice energy meter which is actual. like this all phase CT will connect on energy meter. and make paralleled of phase voltage line on meter.

Is This Answer Correct ?    18 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

please send me the previous year's question papers of jindal GET exams

5994


what is the condition for YnD11

2657


I am going to appear RRB Sr. Section Engineer Exam, Electrical. Can you send me previous year questions of RRB Electrical engineer. specially Section Engineer questions. my email id is likerahulworld@gmail.com

1901


Dear all i want to know SEWA Electrical Supervisor Licence test Previous Year Questions ? If any body know please send to me zohairaukllah@yahoo.com

1132


Dear All we are having a problem in G120 BOP showing alarm A0503, F0052, F0060 we can not remove fault alarm ,Please any body help us. kowsar

1972


Please send 110 kv sb station full single line drawing(sld)

2551


where are the circulat the diesel in DG parts name with pictue

2219


pls,send the previous year written test questions.

1992


what is the minimum pay scale for electrical engineer (building construction)in kuwait? plz revert back with yrs of experience & pay scale respectively.

2253


A 15 kw squirrel cage motor having a maximum efficiency of 90% on a continuous full load has temperature rise of 42 degrees celcius after 30 min and 52 degrees celcius after 1 hr under the above operation conditions. a) calculate its final steady state temperature rise on continuous load and the heating time constatnt. b) if the motor is operated on a short load for 9 min estimate its temperature rise. c) calculate the maximum overload that can be applied on a short, 9 min rating so that the temperature rise is the same as the final steady state temperature rise on continuous load.

1191


hai iam arunkumar. i have applied for an section enginner in rrb. i want lat 5 years solved question papers. if u have please sedn it to arun30682@gmail.com

1902


I am apply the AAI. So i want electrical sample question paper in technical with answer my id is vijayjobsmart@gmail.com

2794


two way ckt diagram can be drawn by how many ways? give diagram

1866


how many stairs have you climbed while you were coming

2266


Draw a SLD of DG distribution up to main LT panel?

9590