Should vertical shuttering done for CC/ RCC for Damp Proof
Course (DPC) be measured?

Answer Posted / anupom

Above answer is right, also
THe thickness of DPC is very less(apprx. 25mm) and is
generally applied as a coating layer for plinth level. Thus
the vertical shuttering may not be measured but this solely
depends on the contract specification.

Is This Answer Correct ?    3 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What are the ingredients of pre-stressed concrete?

768


How much cement and water required for cement selery????

1419


How much quantity water should be placed in one cubic meter area?

891


how to find the cement bags and sand requirements for the one square meter of internal,external,ceiling plastering by using the various ratios like 1:3,1:4,1:5,1:6

1012


could u tell me how to used deform stell bar in reinforce concret?i wanna know the general using in the site!

1657






Method of findingthe dry ingredient quantity of 1 m3 concrete. what is the difference between static and dynamic induced emf? Testing charges bill given for Rs. 32,000/- but not added service tax in this bill. So, How much TDS will be deduct

1017


how do we calculate quantity of cement sand and aggregates in 1m3 of m20 m25 grade concrete?

1994


what is difference between fluidity and workability also how palsticizer works

6695


What is meaning of tlc

1595


Define Who designed the city of Washington DC?

624


How much time Required for PPR pipe network testing

1685


What are the common ways of demolition?

713


Is it worthwhile to carry out tests on particle density of soil particles for geotechnical design?

661


What is fineness modulus ? and its sieve # ?

705


Required concret Surface Temperature prior to coating of epoxy pain with references ASTM or ACI whatever

1773