Should vertical shuttering done for CC/ RCC for Damp Proof
Course (DPC) be measured?
Answer Posted / anupom
Above answer is right, also
THe thickness of DPC is very less(apprx. 25mm) and is
generally applied as a coating layer for plinth level. Thus
the vertical shuttering may not be measured but this solely
depends on the contract specification.
| Is This Answer Correct ? | 3 Yes | 0 No |
Post New Answer View All Answers
What is the diff between cad & cadd?
What is the basic difference between OPC
CAN V USE CRUSH SAND FOR CLAY BRICK MASONARY
can i make bricks using M10 grade concrete ? and what would be the cost of a brick if we use m10 grade concrete sand and aggregates ??
what is spacing of wallar support of 3m column. the thickness of column is 0.25 m.
Can we apply curing compound on ceiling (slab Bottom)
Journal entry Gross salary 10000 Tax 1000 Employee contribution 2000 Employer contribution 2000
relation bet Coefficient consolidation Cv, time factor Tv, drainage path d, & time t is Cv=d2Tv/t Cv=d2t/Tv Cv=tTv/d2 Cv=Tv/td2
Why we provide hair pin for shed
how to calculate the crushing strength of cement concrete paver blocks 100x100x60 mm thich.
Questions related to civil.engg in company
What is Density of cement, sand & aggregate ?
Can you pl explain the procedure steps of singly and doubly reinforced beams in limit state method
plumbing CPVC fitting FTE Brass full form
how to balance aggregate during mix design of concrete???? how to calculate moisture content like C/A,F/A and how many percentage using ice instead of water for example of we are preparing ice concrete??????