how many bricks are consumed for 01 Cum of brick work
Answer Posted / gyanendra singh
approx. 480 no's used in 1cum.
| Is This Answer Correct ? | 4 Yes | 7 No |
Post New Answer View All Answers
What is bylayer?
Define Who designed the city of Washington DC?
For the symmetrical continuous beam shown in figure, Prestressed with a force P = 1500 KN along parabolic curve as shown, compute the extreme fiber stresses over the central support for the uniformly distributed load of 24 kn/m. Use load balancing method.
what is cross hair cursor?
if the nitrates more than 45mg/l in water lead to disease then what is it called
Why should you show Client/Engineer activities clearly on the project plan?
how many kg of 20mm, 10mm, dust available in one ton stone boulder
What is meant by cad?
What is Base Shear ?
How to do bbs in excel format
how to calculate weight of 1.8 cum of aggregate
what is meaning of inverted beam.is it way to provide double mat in slab one at bottom and another at topif we go for provision of inverted beam. shall we construct structure with out plinth beam for us we have to construct small bus shelter
TELL ME THE EQUATION FOR OGEE SPILLWAY
In which code the the maximum height of concrete casting has been explained
1) a)to prepare mortar for bricklaying how much amount of water should be added for its maximum strength and workability(to avoid cracks which results, when high quantity of water is added)?is their a formula or ratio? b) suppose we want to make 1:3 mortar,what is the best way to measure cement ,sand and water and how? c)time before which freshly prepared mortar should be used? d)proper way to mix and make mortar? e)when should curing start after laying bricks and for how long?and also how many hours per day? f)what is shear wall (please in terms of layman lol) bookish definisions are confusing.... g) and last,acc to codes what are max no. of course that should be laid in a day.