Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

what is maximum demand.

Answer Posted / azeem

maximum demand is the product of connected load and the diversity factor.

if a plant is having a motor assembly of 200 kw connected load
than the maximum demand will be(200 kw * 0.85 diversity factor)= 170 Kw for time interval

Is This Answer Correct ?    3 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what is the pre charge circuit,what will be work which function it will be use plz tell me

1935


What is the Surge suppresor? Why using in a UDB's and How it works?

2208


hi can anyone pls tell me the eee interview core questions asked in l&t

2061


How many energy meters can be connected on a 15VA Voltage transformer. please send a calculation sheet.

1947


which network topology offers the greatest level of tolerance?

2160


why sielent pole is used only in hydro generators and not in turbo generators

4188


what is effect of 5amp fuse on 2mva pry protection of transformer

1856


WHAT IS MEANT BY OVER EXCITATION IN GENERATOR TRANSFORMERS? DESCRIBE IT.

2709


How calculated single phase induction motor req. Capacitor?

1592


sir my exam is on 19/6/2013 under electrical branch pls send me sample aptitude questions as well as sample technical questions for jindal steel and power company

2180


hi frenz,its aswathy.i hve aplied for the hpcl test on feb,pls send the test patern & the placement papers as soon as possible. mail-id :kjaswathy@gmail.com

1790


Please nybody say, weather the result of Bharat Oman is declared or not? Probable date of declare???????

2006


i applied for c licence with my one year apperents trainee and i have attaced with A grade contractor company experiance that is for 14 monts experiance this document is sufeicant for c licence? pls tell why they rejected

2270


given data are load current & power factor cable core size? plz any one update the calculation formula

1902


Transformer cores are laminated in order to A simplify its construction B minimize eddy current loss C reduce cost D reduce hysterisis loss

3281