HOW TO CALCULATE LABOUR COST FOR CONCRETE WORK PER CUBIC
METER.
Answer Posted / rocky
YES
| Is This Answer Correct ? | 2 Yes | 2 No |
Post New Answer View All Answers
Is there the dry coefficient of cement is constant?
Design a reinforced concrete combined footing (rectangular) for two columns located 3.60 metres apart. The overall sizes of the columns are 40cm x 40cm and 69cm x 60cm and the loads on them are 1000 kn and 1500 kn respectively. The space available for the width of the footing is restricted to 180cm. The S.B.C. of the soil is 280 kn/mm2 use M15 concrete.
I am a civil engineer . I am also selected for sbi clerk interview which is to be held on 4th May2010 is there anybody resembling the same? what question can be asked and what should be the probable answers?
How u can calculate the Octagon ring distance from center of raft in 275 mtr chimney slipform errection? cantact no:0993455097
how much deduction will be in 32 mm dia HYSD steel bar for 45 and 90 degree bend
how find the cut length of tringular ring and any formula find out the quantity of circular brick work
how to preaper for interview wat they asked in interview give me idea
How to calculate(Thumb rule) the consumption of steel per cubic meter for different concrete members.
How much form and scaffolding per cubic meter volume of concrete class ''A'', ''B'', and ''C''
What is the absolute pressure scale?
What is the coeffiencent Friction Angle between Steel and Ashphalt?
What is the per cu. mt. price of ready mix in Gujarat region.?
What is absolute coordinates?
why development length = 50D . why not 100D
Floor tile measurement? Wall to wall or skirting to skirting