How much steel and concrit required in 1000 square feet
slab?
Answer Posted / shivaji yadav
Steel = .12*1000/10.76 *90 = 1003.72Kg = 1.0 MT
Concrete = .12*1000/10.76 = 11.15 Cum
| Is This Answer Correct ? | 19 Yes | 10 No |
Post New Answer View All Answers
Why are steel plates inserted inside bearings in elastomeric bearings?
What is oneside mat. And explain
how to shuttering is used in slab
How do you compute volume of airflow?
What is the difference between shear and tensile strength?
How did the romans get water up hills using aqua ducts?
which are the Indian auther books for STONE COLUMN/GRANULAR PILES?
if 20mm aggregate is coming by weight 25 ton in a 10 wheeler hywa ,then what will be total volume of aggregate in cubic feet.
what is the method used for marking of cantilevers in hirise buildings by using theodolite
Why are the bolts that hold steel rails together in oval holes?
why we are useing plastic under the lean concrete?and whts the advantage?
how much shouid be the rate for ready mix concrete per cubic meter
"how can we find the approximate quantity of materials using in a building or total Expenditure in percentage for rough estimate after known the construction area(sqm)".please if you know something about that please post the answer.
what is escalation?how it is done?
i want to ecil (Electronics Corporation of India Limited Hyderabad) previous civil engineering question papers immediately please.............