I am having a DG set.The 415 V from Generator is step up to
460 v and then the same is used for Induction furnace.
before Step up, I am connecting LT load to my factory use.
When Induction furnace is in service from DG, when i try to
start a motor, the generator is tripped.Please tell me the
reason.
Answer Posted / r.shanmugasundaram
Induction furnace controller is basically a rectifier cum
Inverter. Generally Rectifiers will generate Harmonics.
Suppose if the DG is not selected to accomodate this non
linear load then the sinusoidal wave form gets distorted
and will trip the DG set or other connected loads which
involves electronic circuitry. May be you can check
with an oscilloscope how the sinusoidal wave pattern
changes when Furnace is switched On. Suppose if the wave
form distortion does not happen then ther could be some
other reason
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
what is the mechanical safety of DG ?
A parallel flow heat exchanger will perform better than a counter flow heat exchanger. State if the statement is true or false.
What is meant by cold loop test in instrument
why we use Test Terminal Block in 11 KV and 33 KV electrical panels.
what will happen if earth of 33 kv cable (earthed system) is not connected to earthing pit?
Write down the name of 2 lady Bir Pratin of Bangladesh
Why HT 11 KV Slipring Motors are connected in star ?
what is difference between 2 pole structure and 4 pole structure in transformer yard
What's mean HVF & HAF in Vacuum Circuit Breaker?
one electromagnet is called
Explain how you intend to work under pressure to meet up with deadline target?
If a surge divertor is required to be protected by 32 amp C Curve Circuit breaker does this limit the amount of protection from surges that you will acheive
why is the power generator connected as star earthed or star earthed through reactance and what its features ?
Direction of flow of active power and reactive power with logic?
Dear all, I'm manikandan I have done by DIPLOMA EEE from 2011 , I have 5 years of experience from Power plant instrumentation field , which one field is give long life & which one field is best ,I confused a lot and also I'm studying AMIE, can I choose which department from Section B examination? pls tell me