How much steel and concrit required in 1000 square feet
slab?
Answer Posted / swaminathan
Assume Slab Thickness 120 & Steel 80kg/Cum
Steel = .12*1000*80 = 9600 kg = 9.6 MT
Concrete = .12*1000 = 120 Cum
| Is This Answer Correct ? | 12 Yes | 23 No |
Post New Answer View All Answers
Laying bitumen concrete 40mm thick using 0.1372 cum of 13.2 10mm metal ,0.2387 cum of 10 5mm metal...what did it means please explain me how much cum of 10 mm metal need?
rate analysis for cement pointing 1:4 , for 100 sq m
What is rolling stock
Reinforced concrete: suppose you are doing rough estimate for purchase of rebar for reinforced concrete slab for single stores residential building. You know total concrete volume will be 100 m3. How many tons rebar 6, 10 and 12mm will you require for the project?
Define a polyline?
1) a)to prepare mortar for bricklaying how much amount of water should be added for its maximum strength and workability(to avoid cracks which results, when high quantity of water is added)?is their a formula or ratio? b) suppose we want to make 1:3 mortar,what is the best way to measure cement ,sand and water and how? c)time before which freshly prepared mortar should be used? d)proper way to mix and make mortar? e)when should curing start after laying bricks and for how long?and also how many hours per day? f)what is shear wall (please in terms of layman lol) bookish definisions are confusing.... g) and last,acc to codes what are max no. of course that should be laid in a day.
How to calculate the quantity of cement mortar 2" for mosaic tile fixing 12"x12"?
what is features of a typ-ical modern air-conditioning installation?
Requirement of cement, and steel 1:2:4 ratio concrete in 1128 Sqft area(Cement No of bags, steel in Kgs)
How much for the BRC lapping in full yield and half yield < and which table to get it ?
At one time what is the height of Lift for concreting for Bridge Piers Class B Loading and refer the code.
how to calculate number of bitumen for road asphalt
What are the advantages of cad software?
What does a construction cost covers and what does not?
What are the advantages of cad software’s?