While casting slab at what length slab casting should be stop

Answer Posted / vikas sampat mahadik

As per my view casting can be done to any extend,only care to be taken for joints,because setting time will be different at certain distance after casting.Every casting end should left angular,later jointing compound should be applied,at beams half beams should be filled in slant,cement slurry has to be applied ,Newer end casting of slab in center, it may end distance 1/3rd from beam.

Is This Answer Correct ?    2 Yes 3 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Can inverted beams used in pipes during construction? If yes, explain how it can be implemented?

876


Define a polyline?

677


Why does the pressure increase under soil?

643


What is the procedure and technnology behind jointing of prestessed block in Delhi metro rail project.

2133


Define block?

708






what is stressing

5797


What is meaning of FREE STANDING STAIRCASE ?

2481


Bernaullis theorem deals with the law of conservation of mass momentum energy none

1577


Will water damage concrete?

758


pls mail some more tecnical qustions at msaranya2610@gmail.com

1692


what s the standrd size of pvc fittings ,like elbow, bend,tee etc ? please explain with figure ?

2023


Why are steel plates inserted inside bearings in elastomeric bearings?

692


TO CONSTRUCT A 1800 SQFT CAPACITY UNDERGROUND WATER TANK HOW MUCH CUFT CONCRETE IS REQUIRED AND HOW MUCH REINFORCEMENT IS REQUIRED. FOR COSTING

2092


I am called for interview from north east power plant .so, I need some interview question which may help me.

1245


Cement consumption of one cubic meter of aerocon blocks masonry?

3660