While casting slab at what length slab casting should be stop
Answer Posted / vikas sampat mahadik
As per my view casting can be done to any extend,only care to be taken for joints,because setting time will be different at certain distance after casting.Every casting end should left angular,later jointing compound should be applied,at beams half beams should be filled in slant,cement slurry has to be applied ,Newer end casting of slab in center, it may end distance 1/3rd from beam.
| Is This Answer Correct ? | 2 Yes | 3 No |
Post New Answer View All Answers
what values & beliefs have guided you in your career path
Maximum cement content in 1cum for RCC and PSC? (please give IS,IRC referance?
How can i do RCC rate analysis?
what post do you prefer to work in this company and why do you think you can serve better in such position?
why does the most of civil engg is not intersted to going for teaching field?
What is the difference between linear dimension and aligned dimension?
Explain soil analysis?
Define a polyline?
writte a c prog. to acept 5 no. from consule and then display them back on consulte in ascending order
how can we construct building without foundation providing only grade beam at ground level
What is command line?
Is there any course for billing available in Mumbai? If yes then please mail me the details..
What is the difference between EPC,DBOOT and BOOT.
What Is the Thumb rule to calculate depth and dia of pile required to carry specified load on differeent soil
IN Compression testing machine 1division =10KN ,then what is compressive strength of 100*100 mm cubes at a load of 320 KN