If you have 10 mappings designed and you need to implement
some chages (may be in existing mapping or new mapping need
to be designed) then how much time it takes from easier to
complex?
Answer Posted / elango
It depends on the complexity of resuablity or re-mapping
based on the client specification.
So this question is to check whether r u smarter enough to
understand the existing mapping and design new ones.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
What is the use of transformation?
What is domain and gateway node?
What are the basic requirements to join two sources in a source qualifier transformation using default join?
Some flat files are there, out of these having some duplicate. How do you eliminate duplicate files while loading into targets?
Explain the mapping variable usage example in informatica
Describe an informatica powercenter?
What is the need for an etl tool?
How would you copy the content of one repository to another repository?
explain about unit testing? in real time?
What is joiner change?
Enterprise data warehouse your projects phase by phase explain?
I have three same source structure tables. But, I want to load into single target table. How do I do this? Explain in detail through mapping flow.
difference between informatica 8.1.1 and 8.6
can i any one explain me realtime healthcare project explanation..for interview .iam new to informatica .thanks in advance.
What are multi-group transformations?