How to calculate cement and sand quantities in cement mortar
As 1:1,1:2,1:4,1:6 ?

Answer Posted / guppi chandra sekhar

Calculation of materials for 1cum of 1:6 Cement Mortar by
Volumetric method:
Specific Gravity of Cement = 3.15 ; Density of Cement =
1440kg/cum
Specific Gravity of Sand = 2.6 ; Density of Cement =
1550kg/cum @ 5% moisture
First of all we have to calculate yield of 1 cement bag
(50kg) mixed in 1:6
Volume of Cement = (50/1440) = 0.03472cum
Volume of Sand mixed = 6 X 0.03472 = 0.208cum (contains 5%
moisture)
Volume of only sand = 95% of 0.208 = 0.198 cum
Absolute volume of Cement = 50kg / (3.15X1000) = 0.016 cum
Absolute volume of sand = Weight of sand / (2.6 X 1000) =
(0.198 X 1550) / (2.6 X 1000) = 0.118 cum
Let volume of water added = 30litres = 0.03 cum
Moisture present in the sand = (0.208 - 0.198) = 0.01 cum
Total volume of water = 0.03 + 0.01 = 0.04 cum
Let, Moisture content in the mortar = 2% of yield
Let, yield = Y
(1-2%)Y = Absolute volumes of (Cement + Sand + Water) =
0.016 + 0.118 + 0.04 = 0.174 cum
Total Yield Y = 0.174 / 0.98 = 0.178 cum
1bag of 50kg Cement produces = 0.178 cum of 1:6 Cement
Mortar with 0.208cum of Sand @ 5% Moisture and 30 litres of
water.
Therefore, 1 cum of 1:6 Cement Mortar requires :
Cement = 1bag X 1/ 0.178 = 5.62 bags
Sand = 0.208 X 1 / 0.178 = 1.17 cum
Water = 30 X 1 / 0.178 = 168 .5 litres

Is This Answer Correct ?    54 Yes 21 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is the material consumption- cement,sand,tiles etc for Toilet dado?

7044


How do you calculate the power of centrifugal pump?

637


What applicable rate of wct in bihar

1384


Why are the bolts that hold steel rails together in oval holes?

695


For elevated service Reservoirs what will be the output of each skilled carpenter and bar bender.

1586






How much wastages taken in 1. cement 2. steel 3. fine aggregate 4. coarse aggregates (10mm, 20 mm)

1381


What is bylayer?

675


Whats be the minimum foundation depth of multistoried building as per height of building in individual footing?

1376


if in column reinforcement lower dia connect to higher dia then from wher we want to start higher dia steel

909


significance of specific surface area of particles?

1780


where i can get material costs on weekly basis

1654


what is right & short method of measurement of slab&beam

1636


how we check the thickness and line of ceiling plaster.

2219


01. a. Diagram of a slump cone…………… 1 b. Size of Slump Cone…………… 1 c. Volume of a slump cone by av. Dia method…………… 1 d. Volume of a slump cone by av. area method…………… 1 e. Volume of a slump cone by frustrum method …………… 1 f. Angles of slump cone …………… 1 g. Slump measured by slump cone due to…………… 1 h. Slump does not measured by cylinder / cube due to …………… 1 i) ii) i. Slump cone is to be filled in……………………..Layers.

5054


Journal entry Gross salary 10000 Tax 1000 Employee contribution 2000 Employer contribution 2000

1218