Answer Posted / vinay arora
the process establish plane table W.R.T. two point on the
ground, whose position already drawn on the plan.
| Is This Answer Correct ? | 3 Yes | 0 No |
Post New Answer View All Answers
How many % we consider for lap for reinforcement for estimates
what is the water-cement ratio of mix design while 30mpa in 7 days?
What is meant by scaffolding coefficient?
What should be the standard roof height like to be?
What are the techniques to measure road difference?
How to compute minimum number of columns required for a site from area of site?
how to shuttering is used in slab
psc girder detail
how much of the strength comes from post-production curing
what is meant by shear center?????
Define line type?
What is the average density of soil?
Technical Question of Civil Engineering
What is the wall thickness of NP-3&NP-4 hume pipe as per I.S code
Why Is Propping Required For Long Structures Once The Form Work Is Removed?