Answer Posted / vinay arora
the process establish plane table W.R.T. two point on the
ground, whose position already drawn on the plan.
Is This Answer Correct ? | 3 Yes | 0 No |
Post New Answer View All Answers
Suggest how many column, beem, etc required for 30 mtrs x 21 mtrs width x 8mtrs height for industrial shed of ground floor. I want to know the quantity of tmt steel consumption and Concrete consumption for budgeting
How to Rectify deep crack formed on Brick Wall? Explain the method of rectify the defect?
in the earthquqke the profile of water on dam is parabolic or not
1.what type of the rock is most suitable for wet mix macadam in construction of road? 2.what is the highest maximum dry density and optimum moisture content can be acheive by using most suitable crush rock?
Are you ready to relocate with your immediate family to United States as a new employee?
what is c4x light weight cement blocks
I measured pcc work as 15.34 m cube , the ratio is 1:5:10 ,want to know the cement, sand and metal used for pcc measured as 15.34 m cube at this ratio.
how to calculate the material from ratio of work PCC, RRM,POINTING, RCC
how to shuttering is used in slab
for 32 dia (EQR HYSD steel) bar how much deduction for 45 and 90 degree band
List out some of the common problems that architect have to tackle it?
Explain different types of rcc pipes.
what is yield and tensile strength of steel, if steel has yeilding strength of 60 psi than how much its tensile strength?
how to calculate the scour depth
why top layer of block work shoud be full size if any cut block adjustable than another layer?