how many bags of cement required in neat cement finish per
square metre
Answer Posted / kumar
above answer is wrong. simply
for one Sqm of neat Cement Finish With 15 mm thick plaster -
0.145 Bags of Cement Required For Sqm.
Calculation = 0.145 * 290=42.05
Sand = 0.015*1260 = 18.9
total Material Cost = 60.95
Labour Cost is = 90 / SQm
So all together = 150.95 Say 150.
from ur calculation
for one Sqm = 32.5 kg of cement
that means = 32.5 X (290/50)= 188.5 / Sqm
is it Any boq Neat Finish gave above 300/
| Is This Answer Correct ? | 4 Yes | 19 No |
Post New Answer View All Answers
The definition of national highway
I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
WHAT IS THE CAUSES OF RUTTING ON FLEXIBLE PAVEMENT?
What is bylayer?
What distance in meters on the ground is the equivalent of one second of arc in longitude or latitude?
Bernaullis theorem deals with the law of conservation of mass momentum energy none
how to find out hard strata in bored pile when the DMC method adopted.
difference between trapezoidal and pedestal footing and how the load acts on that
what is the cost of rcc roof casting of 400 sq. ft. in kolkata
As we know that steel is a tension member but why we are using STRUCTURE STEEL as a COLUMN (Without concrete) where column is a compression member and compression strength of steel is very low
what is a well
What is the biggest dam in america?
what is differences between ferrock and concrete ?
how much need sand and cement for 1 cft roof construction?
how much area can be platered by a mason for exterior