how many bags of cement required in neat cement finish per
square metre

Answer Posted / kumar

above answer is wrong. simply

for one Sqm of neat Cement Finish With 15 mm thick plaster -
0.145 Bags of Cement Required For Sqm.

Calculation = 0.145 * 290=42.05
Sand = 0.015*1260 = 18.9
total Material Cost = 60.95
Labour Cost is = 90 / SQm
So all together = 150.95 Say 150.

from ur calculation

for one Sqm = 32.5 kg of cement
that means = 32.5 X (290/50)= 188.5 / Sqm
is it Any boq Neat Finish gave above 300/

Is This Answer Correct ?    4 Yes 19 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Can inverted beams used in pipes during construction?

866


Rate analysis of 150mm, 100mm, & 230mm thk BBM work

7879


satart to end steps by step process of building construction...? i want to planning theme accuretly

1441


how much is the maximum compressive strength of soil cement and soil-cement-microsilica .

1814


What does civil status mean?

677






what is mean by c32/40s concrete class

1309


What is the l/d ratio of cantilever beam?

1429


what is relation between SPT N value and driving piles after conducting a soil test?

1575


Normally in slabs, steel quantity is not added when you calculating concrete quantity for that slab, why it is not added ?

5596


Whats be the minimum foundation depth of multistoried building as per height of building in individual footing?

1376


How to find the cuplock pipe qty in staging for Minor bridge?

684


How to calculate quantity of cement , sand and granite from concrete mix ratio and volume of work

3143


Why steel rods are produced only in even dimensions?

2159


What is pre-stressed concrete?

654


Explain what is Hybrid Foundation?

739