how many bags of cement required in neat cement finish per
square metre
Answer Posted / kumar
above answer is wrong. simply
for one Sqm of neat Cement Finish With 15 mm thick plaster -
0.145 Bags of Cement Required For Sqm.
Calculation = 0.145 * 290=42.05
Sand = 0.015*1260 = 18.9
total Material Cost = 60.95
Labour Cost is = 90 / SQm
So all together = 150.95 Say 150.
from ur calculation
for one Sqm = 32.5 kg of cement
that means = 32.5 X (290/50)= 188.5 / Sqm
is it Any boq Neat Finish gave above 300/
Is This Answer Correct ? | 4 Yes | 19 No |
Post New Answer View All Answers
Can inverted beams used in pipes during construction?
Rate analysis of 150mm, 100mm, & 230mm thk BBM work
satart to end steps by step process of building construction...? i want to planning theme accuretly
how much is the maximum compressive strength of soil cement and soil-cement-microsilica .
What does civil status mean?
what is mean by c32/40s concrete class
What is the l/d ratio of cantilever beam?
what is relation between SPT N value and driving piles after conducting a soil test?
Normally in slabs, steel quantity is not added when you calculating concrete quantity for that slab, why it is not added ?
Whats be the minimum foundation depth of multistoried building as per height of building in individual footing?
How to find the cuplock pipe qty in staging for Minor bridge?
How to calculate quantity of cement , sand and granite from concrete mix ratio and volume of work
Why steel rods are produced only in even dimensions?
What is pre-stressed concrete?
Explain what is Hybrid Foundation?