Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

how many typetesting of transformers?

Answer Posted / ksn murthy ,j.e,electrical

IR Values, Change of Siclikazal, any oil leakages, checking
of HT Lt side Insulator washers, Both Ht Side and lt side
cable terminations. Tx. Body Earth and as well Neutral earth
this is comes to transformer testing this is as per my
knowledge if any mistakes please excuse me.

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

defination of controlled shunt reactor

2225


how many single tension hardware are required on a double circuit transmission tower?

1919


Incoming line 11kv And transformer capacity is 2500kva. Consumption load is 1300A. Then fuse capacity is 11kv line.

1657


suri transmission

4727


How will calculate losses in an multi core Aluminium LT cable of different sizes & upto what length we can use a LT Cable ?

2119


(1)The demand for electricity , the amount of renewable generation available, the amount of fossil fuel generation available and the cost of the fossil fuel generation are shown in table below period(hrs) demand(MW) renewable (MW) fossil- fuel(MW) cost of fossil fuel(MW) 00.00 - 01.00 2000 1800 2000 30 01.00 - 02.00 2300 2500 2000 30 02.00 - 03.00 2500 2700 2100 45 03.00 - 04.00 2900 3100 2100 50 04.00 - 05.00 2700 2600 2500 45 05.00 - 06.00 2400 2000 2700 50 06.00 - 07.00 2200 1800 2000 36 07.00 - 08.00 2100 1600 2000 36 Assuming that the renewable generation incurs zero cost, determine an optimal generation schedule(specifying the amount of renewable generation and fossil fuel generation used in each period, the cost for each period and the overall cost for 8 hours.)

1833




2384


If only R Phase is connected in 2 pole elcb, n is not connected than it will work or not in ground fault.

1418


In three pin plug 6 amp. 220V ac rating. Why earth pin diameter is higher than other two pin? What its purpose ?

1207


What do you mean by a voltage transformer?

1129


how does an encoder work???

2492


Maintenance of transformer???

2239


All the socket in a room become very hot, the Wall was also became very hot and the earth conductor also became live, what in your view might be the possible causes?

1644


Is neutral transformer can be called as control transformer?

1953


What are the site acceptance tests for power cables, DG Sets, LT panels & 30kVA UPS ?

2370