Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

Simple calculation of improving power factor?

Answer Posted / khalid mohammed yousf

S=V.I (AV)
S = (P^2 + Q^2)^(1/2)
cos &#981; =S/P
Q=(S^2-P^2)^(1/2)
Q=(E^2)/X
C=(1/2*PI*F*Xc)
C IS shunt capacitor using to improved power factor

Is This Answer Correct ?    1 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Why Ac Systems Are Preferred Over Dc Systems?

1353


What happens to voltage when current through the inductor is constant?

1195


which protection used in power plant?

1994


We have 750KVA DG set, we want to introduce REF relay with 1250/1A,CL PS,Current transformers.The lead distance of 2.5mm copper flexible cable from CT to relay is around 5mtrs.We would like to know the knee point votage(VK) & IM calculion for CT's

1973


full form of electrical?

2779


how to determine motor size for a fan application?

2346


Why saturation region slowly shifted in the left side?

1899


Why should we hire you over the others waiting to be interview?

2886


What is core CT & it's function?

2245


what is feed back and what are feed back amplifiers?

1128


11kV capacitor bank of rating 2.4KVAR, is charged with protective relays of only over current & Earth fault &.......without Over Voltage, Under Voltage & Neutral Displacement Relay. Is it advisable??

1645


We have received supplies of the ordered material. payments against the supplies also released. Where ST paid 4% against form C. Meanwhile it has been observed that 25% of material supplied was defective. Please suggest whether the issuance of C form from our side would be stopped till settlement of liabilities.

1992


A low wet bulb temperature indicates

1206


salam&hi, i need to know about how can i calculate an enough current for the new building before i submit it to the suppliers

2138


How to test lightning Arrester?

976