Answer Posted / atanu cool bhuniya
Piling is a technique used extensively by contractors to set a deep foundation for structures such as buildings. By driving and embedding piles of wood, concrete or steel into the deep soil of the ground, the piling contractors are able to provide a strong support to the building structure at the foundation level - a pre requisite for any construction project.
Factors such as the size, capacity & scope of the project, the condition of the soil immediately beneath the ground, and space required for rigging, all need to be taken into consideration before beginning the piling process. As opposed to a shallow foundation, a deep foundation is used to transfer the load of the structure to the deeper, stronger layer of the soil which has a high bearing capacity and can take the load, thus supporting the structure well.
The commonly used Piling materials include wood, concrete or steel - precast concrete piles, vertical columns of wood, steel sheet piles & timber piles etc.
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
Thumb rule for steel qty for 1m2 in kg/m2 column slab footing beam
Explain the benefits of using standard terminology in the measurement process?(Tendering and estimation)
i want texture painting pwd data
I need model question papers for writing the Dubai municipality exam,for G+1
Who name us Engineer & Why?
How u can calculate the Octagon ring distance from center of raft in 275 mtr chimney slipform errection? cantact no:0993455097
what is zone a n zone b?why the spacing of ring in zone a less.n zone b high?
What is different between DI Pipe and CI pipe?
Pile height is 4.3m. 2nos. under reammer. bulb nose is 75mm and height is 400mm. pile dia is 375mm and overall dia 940mm.pls. help to calculate concrete in pile and bulbs separately. What is formula for bulb volume calculation ?
What is the Unit weight of coarse sand (F.M- 2.20) ?????
how to calculate the material from ratio of work PCC, RRM,POINTING, RCC
what course did you consider thinking before you enrolled in college?
LET ME KNOW HOW IS CALCULATE RUBBLE WALL .3'00" IN BOTTOM 1' 6" IN TOP HEIGHT 8' 0" AVERAGE. length 200'00". please give correct answer.
how much percent are used 20mm,10mm?
. Write a C program to perform following functions:- a. Declare one integer variable of all the storage classes. b. Print all the variables without assigning any values in tabular format. a. The tabular format must contain the variable name, type, storage class and printed value on the screen in RED color.