how to calculate sand, cement quantity for plastering (1:5)? what"s the formula?
Answer Posted / hidayathulla
why should we have to take 20% of wet mortar & 1/3rd of Dry mortar......is there eny code for that...or plz tell me where it coms from......plz clear me ....
| Is This Answer Correct ? | 12 Yes | 3 No |
Post New Answer View All Answers
minimum number of bars in a beam? minimum and maximum column size and beam size ? minimum and maximum aggregate size used in multistorey residential building for columns,beams,slabs?
what is mail role & relationship between senior Civil engineer to consultants , Construction manager ,project manager, project engineer ,Technical engineer & qa/qc engineer ? what is the responsibilites of Senior Civil Engineer?
What are the disadvantages while using stone dust as filler in pavements?
what is anchorage length,lap length and (dont remember the last one)
we have a bore well 275 depth & water is deliver at distance of 1000 feet from the borewell here iam not include the distance of depth and the deliver water horizontally at our reserviour tank on ground level
if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.
IS code for Rolling Margin of steel
how to estimate costing from quantity givin in BOQ and according to this how we fill tender and final rate for perticular work.....?
how to calcualate the amount of stone,cement,sand required for 1cum of 450mm thick ruble stond masonary with ratio1:5, please me an answer with dtailed step
I want to know the relevant IS codes of practice which deals with different testings of cement-sand mortar (nominal mix)that is being normally used for brick work or plaster work in the construction work.
How to calculate quantity of cement , sand and granite from concrete mix ratio and volume of work
Define What are the materials used in building a gravity dam?
why do we not deduct volume of steel to find actual volume of concrete in practical???
Reinforced concrete: suppose you are doing rough estimate for purchase of rebar for reinforced concrete slab for single stores residential building. You know total concrete volume will be 100 m3. How many tons rebar 6, 10 and 12mm will you require for the project?
Explain the different types of building contracts?