Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

how do we calculate quantity of cement , sand and
aggregates in 1 m3 of M30 grade concrete ?

Answer Posted / k.nabadwip sharma

Calculation for Cement:-

100 cft of conc in loose 144 to 154 cft required,average of
144 and 154 is 149 cft say 150 cft.

M25 = 1:1:2=4

150cft/4=37.5cft
37.5cft/1.2=31.25bags [1 bags of cement is 1.2cft]
=31.25/2.83=11bags [1 cft = 0.0283cum x 100 cft=2.83cum]
per cum cement required=11bags

Calculation for Sand:-
11bags x 1.2 cft = 13.2 cft = 13.2 x 0.0283=0.374 cum
Per cum sand required = 0.374cum

Calculation for Aggregate:
=0.374 x 2 = 0.747 cum
per cum Aggregate required = 0.747 cum

Is This Answer Correct ?    1 Yes 5 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

how find the cut length of tringular ring and any formula find out the quantity of circular brick work

6501


give me the rate analysis for Bituminous Macadam and SDBC

7485


what is the meaning of degreasing of the euipment or line.

4154


how many types of survey and what are levelling instrument?

2198


What is meant by a context menu in a cad software?

1156


16 questions out of 55 were from the book GUPTA N GUPTA OBJECTIVE of civil engineering. Total ques were 4 ques from hydraullics, 7 from BMC, 4 FROM SOM, 4 from soil mechanics, 6 from transportation, 5 from engineering drawing.

18325


How much Tolerance factors like 1. brick work 2.plaster 3.painting 4.floor tiling 5.wall tiling 6.shuttering 7.concreting 8.steel

1906


why we are useing plastic under the lean concrete?and whts the advantage?

2779


What is specific gravity???

1493


what is the max. and mim. height of vertical post in informatry sign board which is used in highway projects.

2801


How Can I know the wastages(%) of each work added in estimating the quantity of construction materials?(Eg. Ceiling Work, Brick Work,etc....)

2125


how to calculate MR 9(derivation)

3035


What are the disadvantages while using stone dust as filler in pavements?

2556


if in column reinforcement lower dia connect to higher dia then from wher we want to start higher dia steel

1452


How to calculate dry of volume of concrete constant?How it comes 1.54 or 1.57

2143