Answer Posted / imran malik
SPC IS THE MOST IMPORTANT PART TO FIND THE CAUSE OF VARIATION IN THE PROCESS OF PRODUCTION BECAUSE SUBJECT MAY BE VARIATE IN LOWER AND UPPER CONTROL LIMITS .
| Is This Answer Correct ? | 3 Yes | 0 No |
Post New Answer View All Answers
Explain what does green field project mean?
how can u increase the efficiency of a power plant without changing the effort?
What are the effects of carbon on the properties of steel?
what is the use of CW(Circulating water ,clarified water,cooling water),auxiliary cooling water(ACW),auxiliary raw cooling water(ARCW)in thermal power plant.plzz explain the different characteristics of these types of water.
What is the date of first titan launch from cape canaveral?
how to calculate stiffners position and size in transformer design
which fit is this 177-S6?
What is the spinning jenny?
What are to be checked in an induction motor?
In Rankine Cycle we use the concept of Tm(mean temperature of heat addition).In actual cycle the efficiency comes as n=1-T2/T1 Taking Tm into consideration it comes as n=1-T2/Tm as T1>Tm so the efficiency for both case will not same for a same cycle. Can anybody explain how it is possible? Advance appreciation for your effort.Thanks
I m having skype interview with germany team what are the common questions asked?
how gravity filling machine is designed
how the material no. 2062 will mild steel of desity 7.85? what are the other codes?
What is the difference between torque and power?
i m a 1st year student my senior asks me 2 give intro wht will a impressive answer