Pls. help.
If a contract was awarded to a contractor in april 2012 with
steel & cement base price as rs. 45/kg & 250/bag. Now in
oct. 12 steel cement price becomes 55/kg & 290/ bag. How
escalation will be calculated? Pls. tell complete calculation
Regards,
Answer Posted / jai
The prise quoted by us in the BOQ wil be the finel prise...
| Is This Answer Correct ? | 0 Yes | 1 No |
Post New Answer View All Answers
what is the basic difference between Coloumn & Shear Wall
what is yield and tensile strength of steel, if steel has yeilding strength of 60 psi than how much its tensile strength?
HDPE pipe standard bends using for TSE irrigation? is it possible to use 30 degree?
does a b.tech civil engineer fresher supposed to know how to design rcc structure?
Find out Cutting Length of Steel for Right angle Triangle? Where Opposite Side 4m, Adjacent side 6m. (Assume cover 40mm)
What is min thickness,min grade of conc & age of PQC ?
for pretensioning which will yield first and same for post tensioning?
What is Heavy Concrete & Normal Concrete
beam length 73 feet 4 inch,width 01 feet,height 50 inch so every beam load how much? and what quantity of M.S ROD? both side ony two column in middle no column.pls inform me that this is stable or not ? and how much risk of this beam?
What Are The Different Type Of Slump Test Indications?
important question on stones
how to create our resume?
How to calculate laplength for 3 floors
How to make tiles floor step by step procedure?
if size is 235cmsx15cmx100cms so how many cement bags and how many sand bags are used for concrete mix