What is C check in a diesel generator and what are parts
and what has to be done during the C check
Answer Posted / sanath shetty
C-Check is done in (Every 800-1500 Hrs.)
following are the checks
1. Change oil.
2. Change oil filter,fuel filter,bypass filter.
3. Change Air Filter.
4. Change water Separator
5. Radiator cleaning with chamical
6. Check All Electrical terminal & thimbles
7. Check polution level.
| Is This Answer Correct ? | 9 Yes | 2 No |
Post New Answer View All Answers
is ac supply can store
What are gain margin and phase margin?
EXPLAIN THE WORKING OF SERIES REACTOR IN HT CAPACITOR BANKS (FOR VOLTAGES & CURRENTS)
As per standard, transformer body earthing and other Equipment earthing (Equipment earthing) did not connect. but in LT side termination we are doing metal glanding in both side Transformer to PCC Panel through armoured cable, now X'mer body earthing and PCC Pane earthing (Equipment earthing) both are connect.is this safe for X'mer or other equipment?
What is dynamo?How it works and what is the function of dynamo in a DG.
Which motor is 3.3 or 11kV more reliable, in terms of efficeancy,maintenance, reliability.
Define resonant frequency?
How to calculate the copper in HT motors if KW, RPM & Voltage is given
How to calculate total harmonic distortion level(THD) in VFD? and how can we reduce harmonics?
According to IEC60034-14, When the vibration monitoring system required for motor Bearing. above which KW, it is required? and for what type of bearing the vibration probe is provided.
what types of electrical & mechanical test conducted in switchyard?
How is the gain affected by the introduction of feedback in a control system.
What is the range of the stator resistance of 3 phase induction motor?
how give earthing conection to household equipment?
how to calculate slip ring induction motor stator and rotor currents??