What is C check in a diesel generator and what are parts
and what has to be done during the C check
Answer Posted / sanath shetty
C-Check is done in (Every 800-1500 Hrs.)
following are the checks
1. Change oil.
2. Change oil filter,fuel filter,bypass filter.
3. Change Air Filter.
4. Change water Separator
5. Radiator cleaning with chamical
6. Check All Electrical terminal & thimbles
7. Check polution level.
Is This Answer Correct ? | 9 Yes | 2 No |
Post New Answer View All Answers
what is the differences between microprocessor and general purpose computer
wat system call?
According to IEC60034-14, When the vibration monitoring system required for motor Bearing. above which KW, it is required? and for what type of bearing the vibration probe is provided.
Draw the single line diagram of the power station?
which capacity of RCCB used for five thousand watt electricity load?
How short circuit MVA(Fault MVA) in a power system calculated for calculating number of earth plates ?
sir i had plane to do some project with the base of hopkinson test in AC supply its possible
who many types of fire explane with exmple
i want wipro vlsi placement pattern please send me
which metal is use in shunt
dg started in plc mode and load taken later one battery terminal connection will be disconnected by loose connection what will happen for dg and shall we connect battery terminals while dg in load time?
1.What is captive power plant? 2.What is national grid?Give brief idea.
how does an centrifugal and screw type chiller will work. which chiller efficiency is high and why.
What are the advantages of speed control using thyristor?
what is difference between line differential and transformer differential?