Pls. help.
If a contract was awarded to a contractor in april 2012 with
steel & cement base price as rs. 45/kg & 250/bag. Now in
oct. 12 steel cement price becomes 55/kg & 290/ bag. How
escalation will be calculated? Pls. tell complete calculation
Regards,
Answer Posted / viswanadhamklvs
Generally the PVC formula will be given in the Contract
document itself. The month in which the contractor quoted
his bid will be considered as Base month. The indices for
the commodities will be published by the office of Economic
Adviser in the web site eaindustry.nic.in. These index
values shall be substituted in the formulae given against
each commodity viz., steel and cement. In the same fashion,
labour component also shall be considered based on the index
value given by labour Beuro of India.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
How to fix the reinforcement in footing shorter bar at bottom and longer fix at top.
what is Bearing Capacity,How to determine it?
Explain major differences between routing maintenance and major maintenance.
Forces in a Shear Wall are in plane or out of plane ?
Can you pl explain the procedure steps of singly and doubly reinforced beams in limit state method
how much shouid be the rate for ready mix concrete per cubic meter
explain the rale of the government in the construction industry
What is portland cement
Are cruise ships built for the transatlantic run?
I just got a first job in Maharashtra and m a fresher. My task is estimate the cost of excavation of earth with J.C.B. can anyone tell me how to do this??
Providing and casting in situ cement concrete M-25 of trap/granite/quartzite/gneiss metal for rcc, Providing formwork,Curing the concrete and Complete. what is rate per Cum. and what is rate for M-30 Grade Concrete.
How do you compute volume of airflow?
can you provide a link for manual design of building?
what motivates you to do a good job
What are the materials used in building a gravity dam?