I am getting diesel genset 62 kv for my house
In addition there are 6 meters of 11kv for the house
Lift also being installed for house plot sise 200sq yds
total 4 + 2 foloors
I want to know how much earthing required how deep it should be
Answer Posted / v.venkata ramana
required for dg set earth pits are 2 no,s of dg body, 2 no,s
of dg nutaral.
6 meters required to 6 earth pits and lift also required to
2 no's body earthing
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
Dear all, how we select the cable size according to current with or without including different correction factor , is there any direct method for sizing of cable...
What are the main significances of root locus?
How seriving & testing of the HT & LT breakers are done. What are the standard Ir values on which we can come to know the test is passed or failed?
What is T’Q and X’Q and X’D ? and what is saturated as well as unsaturated ?
if two transformers are placed parallel & both have fault impedance of 50KA will it increase or decrease show example?
bsnl tta exam question
Efficient electrical earthing in hard rock area
how is capacitor bank look like
How to calculate the fuel consumption for 600kva DG genset which connecting with 25%load?
what is the earth current,reverse power,electrical trip generator short circuit,low voltage, high voltage please discribe me
What is the resonant peak?
To prove the capacity of a 10MVA transforemr with 6.5% impedance by a short circuit test how much power is needed to inject an impedance voltage if we have to arrive for its rated current?
Explain the working of any one cutting machine
we are having 110 Kv,250mA Electrostatic precipitators for coal fired boilers. what will be static voltage and current after discharge and what time it will remain before earthing?
what type questions asked in hp cl