How to calculate the compressive strength of 28 days of
concrete where we have 7 days compressive strength?
Answer Posted / n rajesh guttedat
In 7 days compressive strength must be 65% of 28 days strength
| Is This Answer Correct ? | 10 Yes | 2 No |
Post New Answer View All Answers
I want some common questions which have been asked in interviews of NTPC Limited,Satluj Jal Vidyut Nigam Ltd.,and Bharat Heavy Electricals Ltd.
what is features of a typ-ical modern air-conditioning installation?
how to decide the mortar ratio 1:4,1:6 in masonry? same in plaster 1:3 and 1:4? which code or any document reference taken to define proportion?
Define aligned dimension?
How to find permissible diagonal tensile stress in reinforced brick work
for Precast foundation howmany days required we can shift the foundation with american Standards i need reference with section any body can help
What is the name of this multiplication factors ?
How to calculate the cement consumption in RR Masonry in CM 1:8 for the foundation of Ground Level Reservoir
What is hybrid foundation?
How will be cutting in timber plate size 600*400 column size
how much cement is consumed by a stone masonry wall 17.7m long,0.55m wide and 1m high
Define What is a kip?
Bearing capacity of soil determined as per ASTM is to design the foundation size.what is the importance of EV1/EV2 value as per DIN .My consultant ask me to test the the soil as per din to find out this ratio to assess the compacted strength of soil ,,?? is it meaning full ??
sir how can we find the cement and sand required for making 4" drop
what is SDLC ?and write a 'c'program for to swapping the three numbers?