Why we use sin wave only in ac not use any other form of wave?

Answer Posted / mohammed kamil

We can say that a sinusoidal waveform is rather analog
(continuous) and not discrete (in steps)

Is This Answer Correct ?    3 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

a concrete mix 1 2 4 by volume with water cement ratio as .6 by weight if moisture content in F.A is 6% with 20% BULKING AND IN C.A 1.5% by volume. find quantities of different materials required for one bag of cement

1654


why steel tanks are provided (a) for water pressure (b) for wind pressure (c) for earthquake pressure

1187


what is the use in canals of longitudinal drains and cross drains in lining areas?

1369


how to find ssm in foundation?

1429


what radial pressure, the NP2 class rcc pipe can sustain?

2885






Iwant to calculate the production of 1 labour for concrete casting which includes shuttering,scaffolding,steel fixing,concreting, deshuttering and curing in 8hours.But i am not able to determine it approximately would you pls.??

2232


How can we calculate 8- storied Madrasha Building pile capacity by taking SPT value at site?

1566


How much area, in square meters, will one liter of paint cover if it is brushed out to uniform thickness of 100 microns?

1037


how to frame the sentence in voucher pad ? Description : 1.Food Expenses during site visit 2.Stamp Paper approval expenses 3.Travelling expenses 4. sweet distribution

1680


Which ratio use for cement selery???

1383


1) write Short notes about Shellow & Deep well? 2) What is the full form of SPT & SMB? write short notes. 3) write short notes about efficiency of Riveted joint.

2235


what is the tensile strength of 10swg and 8swg gabion wire?

1552


how to calculate load for a bungalow and 1column carry how much load if the size of column ,9"*15" .....or total structure load......

1415


Providing ,Cutting, bending and positioning of TMT Bar with cost of binding wire

1142


Labor requirement for each item needed? Lean Concrete 103.550m3 Concrete for Foundation and Structure 1753.000m3 Expansion joint 288.000m Contraction joint 127.000m Dowel bar 450.000m

1284