How to calculate Cement, Sand and Kapachi required for M20,
M25
Answer Posted / n3
for nominal mix like M10,M15,M20,M25 the proportion of cement ,sand & agg is fixed as posted above.but for rich mix like M30,M35... the proportion is requred to be design by various method like IS method by using chart,table etc.
| Is This Answer Correct ? | 4 Yes | 1 No |
Post New Answer View All Answers
How do we calculate the power of centrifugal pump?
What is critical path method (c.p.m)?
important question on stones
Method of findingthe dry ingredient quantity of 1 m3 concrete. what is the difference between static and dynamic induced emf? Testing charges bill given for Rs. 32,000/- but not added service tax in this bill. So, How much TDS will be deduct
How much Tolerance factors like 1. brick work 2.plaster 3.painting 4.floor tiling 5.wall tiling 6.shuttering 7.concreting 8.steel
what is E
specifications of fe500 steel
How to testing voids of filled aggregate in bitumen mix design
Permissible wastage of cement as per IS code ? In which IS code I get it?
i have span of 6m x 4m how do i calculate the reinforcement of steel i needed and to at what distance and also the thickness of slab. looking forward thank you RAVI
Define What is the best type of wood glue?
What is the general specifications of a bituminous pavement road?
Define What is a projection line?
material used for mendrel use to bend epoxy coated rebar
how will remove spiderweb cracking in plaster ? what the reasone of make it ?