steel quantity is found by
multiplying ( number of
bars*length of one bar*unit
weight of steel) where unit
weight of steel is D^2/162,D-
is dia of bar. Same procedure
for stirrups and links.

Is This Answer Correct ?    146 Yes 13 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

You have 3 snd sample of different FM=0.21,FM=0.95,FM=2.90 which one is suitable for a)plastering on R.C.C b)plastering on masonary wall c)concreting column d)concreting of bored pile.also justify your answer.

1733


Explain the importance of moment of inertia?

745


I am called for interview from north east power plant .so, I need some interview question which may help me.

1241


how much concrete solid/hollow block are manufacture per 50 kg cement bag in differnent sizes like 400x200x200mm, 400x200x150mm, 400x200x100mm. And need proper ratio as per sale quantity. pls send my mail mathi7599@gmail.com searching last two years not yet get pls find and enclosed pls. need practical analysis.

2230


In Residential home construct footing,beam, column,lintel,rcc roofs which dia rod used how to self assumed

2688






Reinforced concrete: suppose you are doing rough estimate for purchase of rebar for reinforced concrete slab for single stores residential building. You know total concrete volume will be 100 m3. How many tons rebar 6, 10 and 12mm will you require for the project?

2381


What is the name of this multiplication factors ?

1697


Define What is aggregate?

691


sir, please send me the web address of chennai railway to know the online examresults of junior engineer[civil].

1665


how to caluclate sienerge qty in construction in ap

1886


I am doing a engineering contract with GOI. I have purchased certain material from outside Maharashtra and paid CST on that material @ 5.25%. Please intimate whether I will be liable for VAT or VAT on works contract or not.

1572


What is progress payment?

694


What should be the lap length in raft if height of raft is 0.800mm ...it couldn't b 50D or 40D...we just have to join upper and bottom reinforced...is there any formula for determine it...

1523


What is the per cu. mt. price of ready mix in Gujarat region.?

1775


In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?

1664