Target strength = fck +(1.65*4)
What is this 4
Answer Posted / ranjan
standard deviation only for M-20 & M-25
| Is This Answer Correct ? | 2 Yes | 3 No |
Post New Answer View All Answers
why we provide bent up reinforcement bars at l/4 ? if it is because of diagonal shear , how does it acts ?
what is conrete grade ,how are depent on concrete grad and size of concrete?
How much river sand contain the 6 & 10 wheeler truck? Or Maximum sand that any type of truck carry?
What is the maximum crushing load in Kg & crushing strength in N/mm2 for M25 & M 15 Grade concrete
How to calculate chejja reinforcement
What are the govt approvals required for starting of power project. means from initial site grading and excavation work.exm. blasting in hard rock, deep excavation, cut off trees from site.
Describe the various methods of concrete curing?
How to find weight of steel in kg if we know the area which is in m2? Following details are known to us, Area=125m² thk of slab=250mm Steel details:T12@200 PS:considering mesh top and bottom with X and Y direction
Which is the indian standard code of line out. ? How much tolerance fot 1 mt lenght? Its challenge....
rate analysis for cement pointing 1:4 , for 100 sq m
wat would be the probable interview questions and GD topics for IOCL exam?
Is it necessary to apply tack coat over the primecoat. IF not what happens.answers other than 1.to superimpose the next layer(2) to adhere the layers so as to form homogenity.
satart to end steps by step process of building construction...? i want to planning theme accuretly
When column of building is abutting the boundary line,then suitable footing advised is
why is M25 and Fe 500 assumed to be most economical? i feel it is not.This is because higher grade of concrete and steel has higher lapping length and anchorage length compared to lower grades..