Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

which software better design in structure design or Rcc
design(STAAD PRO,TEKLA STRUCTURE)

Answer Posted / albin bensam

Now a days, we used to design the Steel and Concrete structure with STAAD Pro, SAP2000 and ETABS. If you want to design the shear and welded connection design, base plate design.., please to use PROKON.

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Describe the various methods of concrete curing?

1125


give me the rate analysis for Bituminous Macadam and SDBC

7401


Suggest how many column, beem, etc required for 30 mtrs x 21 mtrs width x 8mtrs height for industrial shed of ground floor. I want to know the quantity of tmt steel consumption and Concrete consumption for budgeting

1786


Why should pumping be not used in case of concreting works?

1402


how many litres of enamel paint required for 5000 sft of site?? 

1923


how many shuttering material required for 1000 sq.m built up area.

2346


why is M25 and Fe 500 assumed to be most economical? i feel it is not.This is because higher grade of concrete and steel has higher lapping length and anchorage length compared to lower grades..

2595


satart to end steps by step process of building construction...? i want to planning theme accuretly

1939


I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?

2079


How to find weight of steel in kg if we know the area which is in m2? Following details are known to us, Area=125m² thk of slab=250mm Steel details:T12@200 PS:considering mesh top and bottom with X and Y direction

3080


Concrete cover for slab, column, beam and footing?

1075


cement, sand, aggregate,reinforcement & concrete consumption per square feet in multi storeyed building

2418


What expenses counted in contingencies and how much it is in related to built-up area of the building.

1758


What is the primary difference between adsorption and absorption?

1104


Reinforced concrete: suppose you are doing rough estimate for purchase of rebar for reinforced concrete slab for single stores residential building. You know total concrete volume will be 100 m3. How many tons rebar 6, 10 and 12mm will you require for the project?