Answer Posted / shalabh
Yes you can deimplemented Snote
| Is This Answer Correct ? | 2 Yes | 1 No |
Post New Answer View All Answers
can u explain step by step procedure of DB REFRESH..Ravi
What is the difference between consolidation and development route ?
What is JVM switch. Why JVM switch is required ?
How will go about doing a client copy ?
What is ocm and how to apply ocm patches?
What is rfc connection?
What are the activities you done in EP?
Can anyone help me in educating me in installing SAP 4.6C over windows server 2000. Please make it a step by step process, my career depends upon the success and failure of installation.
Where will u find transport error logs?
1)Have you used performance tuning? What major steps will you use for these? 2)In production what is the user exit? 3)What type of user exits have you written? 4)Difference between Search Helps and Match Codes 5)On which even we can validate the input fields in module progams? 6)what are the table controls in BDC ? 7)what is the difference between bdc and lsmw ? 8) If the scripts are client dependent, what above driver program ? (client dependent / independent) 9). I have two pages, In one page I want address, Header, Main & footer. In the second page I want only Main. How to do it? 10) Will 50,000 records be uploaded directly into APP's Server? 11) What is the button to change the variant in ALV ? 12) If your project is support project ? when is your implementation has completed ? 13)In start of selection, if we perform validation, what happens ? 12)How to join 3 tallies & looping. We have developed a program in a client say (200- client) and 210 has test data. No developing rights. How to test data? 13)How to transfer data which is coming from are report as output to another report 14)How to create standard text and how do u transfer it ? 15)What are the views when we are creating Material ?
I'm getting the following runtime error in IDES "DYNPRO_MSG_IN_HELP". GUI is 720 final release and patch level:0
A transport is imported into QAS in 2 min. time the same transport when imported into PRD is taking more than 20 min. why? What to do?
If job is slow?
what is role of sap administrator in pi & ep?
What will happen during the export process?