why we done superheated steam in to saturated steam.

Answer Posted / shobhit kesarwani

conversion of saturated steam to superheated steam for incresing efficincy of vapour power plant . but question is covesion of conversion of superheated to seturated steam for increasing humidity in air in refrigeration field.

Is This Answer Correct ?    1 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Purpose of lubricator in a large diesel engine.

1528


how to calculate the size and weight of induced draft axial fan impeller

994


Explain the difference between pearlite and cementile ?

678


sir, i am going to appear in the test of BEML 2009 so i want to get the type of question paper asked in previous exams of BEML.

2564


If you want to provide water or any chemical @ 50 meter height how much head will you prefer for any selected pump...consider it is M.S pipings...how much friction loss will be there...show with calculation.

1859






Explain the mechanical advantage of a double pulley?

658


interview questiions for production planning

2515


what is bms system and how to work it

1191


In order to ensure constant pressure and constant flow rate of compressed air what should we put between the compressure and end user?

1197


Where do railway steam engines carry there water?

622


if we not carried out B check at mean time in DG set what will be happen?

1472


Dear all, Will some one help me in this issue please? We are entering the Zero Stock Component in Maintenance Order, and we make a Check when the order creator is going to release system will appear Error, until he will not delete that zero stock components from the Maintenance order. but right now what the order creator is not releasing the order but he is going to save order, when's he save the order without release system will generate Reservation in the back ground, which should not happen for Zero Stock Components ? I need the way which we are doing in MB21, Reservation creation by thru Cost Center / WBS Element. At present if you run MB21 and you are going to issue the material system will not allow to generate the reservation if there are zero stock components in the list. please guide me for this issue ? Note : Simple what I need is I don't want to create any reservation thru maintenance order for the Zero Stock Components. Regards, Abdul Mujeeb

1375


any one have amw(ASIAN MOTOR WORKS) QUESTION PAPERS OF PREVIOUS PLS SEND ME AT mahendra_yalavarthi@yahoo.com

3420


we use parallel flow heat exchanger to coo oil of 1000 EP viscosity,oftenly tubes may damage during cleaning etc what is proper way to clean cooler? How impurities decreased or vanished during working or in less teme job performed?

1424


dear sir i m anshul kumar from dehradun i want to last five year railway chandigarh and allahabd entrance exam papers pls send it on my id my id is anshuldhiman83@gmail.com or anshuldhiman@rediffmail.com i shall be very greatful to u thank u

1891