What is Purchase Requisition means? Why we used this in MM
Module in SAP? what is t.code of it?

Answer Posted / chandra shekhar agarwal

T CODE : ME51 or ME51N

It is a request or instruction from particular department
(Cost Centre) to purchasing department to procure certain
quantity of material and services. It is only one internal
document in SAP-MM.

Is This Answer Correct ?    4 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What settings required to create purchase order automatically from a pr?

667


How did different versions of sap evolve?

664


What is a ‘return delivery’?

814


What is a batch?

640


Do we include consignment stock (material provided by vendor) in physical inventory? Why?

683






How to handle free items in po?

663


What are the variousfeatures of consignment stocks?

703


Where is material master data saved?

683


What are the industry-specific solutions available in mysap?

902


What is the difference between release procedure with classification and without classification and when they used?

639


How does material price copy into a purchase request? What is the sequence of priority for copy price in pr?

665


What is cbp?

643


What is the quota arrangement?

586


How much effort is it going to take to implement?

596


What are the initial configuration steps for inventory management?

657