Why 30°phase shift occur in star-delta transformer between
primary and secondary?
Answer Posted / k.prakashchandra
There has to be a shift ,just overlap vector diagrams and see
| Is This Answer Correct ? | 2 Yes | 5 No |
Post New Answer View All Answers
In general bus riser follows the bus section in SWGR. What are impacts if bus section follows bus riser?
why we use two slope(differential & restraining) in differential relay.but in busbar protection differential we are using only one slope?please explain
DEAR SIR,I GOT THE CALL LETTER FROM RRB, SECUNDERABD AS A JE-II SO PLEASE PROVIDE ME SOME MODEL QUESTION AND ANSWER PAPERS AND LAST YEAR QUESTION PAPERS
I WANT HOW CALCULATE TO CABLE FOR WELDING PLANT ?
A 15 kw squirrel cage motor having a maximum efficiency of 90% on a continuous full load has temperature rise of 42 degrees celcius after 30 min and 52 degrees celcius after 1 hr under the above operation conditions. a) calculate its final steady state temperature rise on continuous load and the heating time constatnt. b) if the motor is operated on a short load for 9 min estimate its temperature rise. c) calculate the maximum overload that can be applied on a short, 9 min rating so that the temperature rise is the same as the final steady state temperature rise on continuous load.
Explain thin film resistors and wire-wound resistors
what is the difference between active power and reactive power and apparant power in practical as well as theoritical
Differentiate between ideal and non-ideal voltage sources?
how generator load test is conducted?what are the steps?
how many electricity poles are there and what are the names and their sizes.
What are the material used for resistor?
Define sensitivity?
A 50Hz,4-pole,3-phase,star-connected synchronous motor has a synchronous reactance of 12ohmsper phase and negligible armature resistances.the excitation is such as to give an open-circuit voltage of 13.2kilovolt.the motor is connected to 115kilovolt, 50hertz supplying. what maximum load can be the motor torque,line current and power factor?
where is the need for short circuit test for 3 see is required and why? can you explain in brief with application
hi friends if you have any 400KV Substation Erection and installations Drgs please send to me.My email id:kandi.suresh441@gmail.com