how we can calculate a bentup hook in difreeent angles.for
exp.at 90 degree,45degree,60 degree..
Answer Posted / subhasbabu
FIRST CALCULATE STRAIGHT LENGHT BETWEEN EITHER BENDS THEN
TOP STRAIGHT LENGTHS, NEXT BEND LENGTH CAN BE DETERMINED BY
PYTHOGOUROUS THEOREM
| Is This Answer Correct ? | 0 Yes | 1 No |
Post New Answer View All Answers
how to calculate the crushing strength of cement concrete paver blocks 100x100x60 mm thich.
how much of the strength comes from post-production curing
please give the detail design for the soring and shuttering for 8.5m deep excavation in the sandy soil for 25x10 rectangular streaches
What is semirigid connections?
In the roof of a pumping station explain briefly the components of a waterproofing system?
My daily concrete volume of M25 concrete is 1st day= 25 Cum 2nd Day = 45 Cum 3rd Day = 55 Cum 4th Day = 22 Cum 5th Day =72 Cum 7th Day = 49 Cum. What will be acceptance criteria of concrete considering as per is 456 cl.15 and table 11 (cl 16.1 and 16.3).
que.is ideal size of bricnk use in india,joint size of mortar in massinary ,how many bricks used in 1cum.how to test at site.what is the possition of marka used in bricks?
Explain what is Critical Path Method (C.P.M)?
What is the difference between Fe 500, Fe 500 D and Fe 515.
What are the RISKS during the project construction?
rimmer in pile foundation
1. HOW MUCH CEMENT AND SAND REQUIRED TO PLASTER 100 SQM WALL. 2. HOW MUCH CEMENT AND SAND REQUIRED FOR SCREED WORK OF AREA 30 SQM
Reinforced concrete: suppose you are doing rough estimate for purchase of rebar for reinforced concrete slab for single stores residential building. You know total concrete volume will be 100 m3. How many tons rebar 6, 10 and 12mm will you require for the project?
What is meaning of FREE STANDING STAIRCASE ?
IS code for grade of concrete for bamboo lintel????