what is the maximum load on for 10 kva & 25 kva transformer
Answer Posted / kaleem
aroluli which voltage we'll use ? line to line to line to line to ground ?? 230 or 400 this formula to calculate 3 phase current ?? p= 1.73 v i cos@
| Is This Answer Correct ? | 3 Yes | 1 No |
Post New Answer View All Answers
what is difference between 9kv 5ka surge arrester and 9kv 10ka surge arrester.
How much of the total hydro power potential has been exploited so far in india?
What does quality factor depend on in resonance?
what are symmetrical and non symmetrical components in electrical installation.
In electrical what is earth(ground)connection, wht is the importance of it, why it is recomended to maitain below 3VAC between Neutral and earthspecially in PLC used machines?
As per the Anchor capstan motor specification, full load current is 200A. starting current is 1750 A and acceleration time is less than 8 seconds. Please guide for selection of cable size.
How to calculate of maximum demand if given 628kw, 785kva, 0.8 p.f.
How to decide the size of the capacitor for a single phase induction motor say 2 HP ??
What is a slack bus?
WHY NUTRAL GROUND SYSTEM USED IN 33KV SYSTEM
Sir,In our company there are 3 caterpillar make(capacity:(1) 3.3KV,2.5MW(2)3.3KV,2.5MW & (3)3.3KV,1.9MW) & 1 deutz make (capacity:11KV,3.8MW)gas engines utilised,all are running in paralell. There are three transformer utilised,(1) 6.25MVA,3.3KV/22KV,Impedence voltage:6.7% used for two generator,both are 2.5MW(2)5.5MVA,3.3KV/22KV,Impedence voltage:7.2% used for one generator of 2.5MW & (3) 5.5MVA,11KV/22KV,Impedence voltage:7.8% used for one generator of 2.5MW.all generator breakers capacity of 1250Amps. Sir,I want the details of fault level calculation of generator,transformer individually & for whole system. If you require any information from me.feel free for contact me sir.pl.send the answer of my question as the earliest as possible.
Describe the test procedure to determine the vector group
what is meant by directional earth fault and non directional earth fault? describe both.
Z transform is use when system is not a) converges b) diverges
Is there a possibility to use such a treshold voltage for the NMOS part of a CMOS circuit that during the switching it will start conducting only after the PMOS part will be already closed, by this eliminating the leakedge current? Please note, I'm not asking about the well bias in standby mode, but about the "antileakedge" measures during normal operation.