how to calculate 1:2:4 ratio concrete cement, sand, metal
and water please give me brief calculation
Answer Posted / decosta
For volume 1 cu.m
Consider:
Cement= 1x1/7=0.14 cu.m = 4 bags, since 1 bag= 0.035 litre
Sand= 1x2/7= 0.29 cu.m
aggregate= 1x4/7= 0.57 cu.m
When we sum up give us: 0.14 + 0.29 +0.59 = 1.02 cu.m
| Is This Answer Correct ? | 5 Yes | 9 No |
Post New Answer View All Answers
pile load testing procedure
What is absolute coordinates?
What in bending moment, if a moment is free end of cantilever beam?
What is the amount of work done by a carpenter, bar Bender and plaster Mason in interior and exterior plaster
How to calculate the crank rod in slab
what r the precaution for high in atp tempareture,low in atp tempareture
what is the code provision for acceptance of fineness modulus range for fine aggregates in design mix
How to do rate analysis for concrete work including shuttering work?
Define What is the force exerted by the Tacoma narrows bridge?
1.what type of the rock is most suitable for wet mix macadam in construction of road? 2.what is the highest maximum dry density and optimum moisture content can be acheive by using most suitable crush rock?
What are the uses of layer?
what is the Purpose of Adding 20% of wet mortar & 1/3rd to Dry Mortar for PCC & Plastering & Rcc .is there any standard method for adding this .?
from one meter cube of stone masonry structure how much cubic meter of cement mortar we use as our estimation 25-30% is that correct for estimation of quantity of sand and cement(2:1) proportion of mortar
Mention what are the composition of a landfill?
why do we provide haunches in rcc box or underpasses?