What are mandatory fields for PP configuration
Answer Posted / rosy
mandatory fields of SAP PP configuration are
1-plant parameters for mRP(0ppq)
2-creation of order type(opjh)
3-order type depended parameters(opl8)
4-scheduling profile(opkp)
5-assign number range for odrers(co82)
| Is This Answer Correct ? | 10 Yes | 1 No |
Post New Answer View All Answers
Explain Flexible planning Procedure?
In project the customization is comes under which phase?
How is indian slab and us slab?
What is the SPRO Path for requirement class and req. type?
We have a lot of size procedure here which is creating more order proposals. How do you set the limit value for the maximum number of mrp order proposals per date in img?
What is processing class, where we do them and why?
Explain the lsmw and the steps involved in them.
What is pi sheet
What is the data you give in S.O.P screen?
How can you get planned orders scheduled so that you can do capacity leveling ?
What is the output of mps run ?
Suppose the client wants me the vacancy to be displayed on a website as well as ess. How should I do it?
What is the purpose of using capacity planning?
What is mrp list and what is the use of it?
What change management functions do you require? How do you want to define the validity of BOMs (based on date/freely definable parameters)? Must existing change histories be transferred to the R/3 System?