How do you find the difference between 53&43 grade cement
in site?

Answer Posted / alok rav

The OPC was classified into three grades, namely 33 grade,
43 grade and53 grade depending upon the strength of the
cement at 28 days when tested as per IS 4031-1988. If the 28
days strength is not less than 33N/mm2, it is called 33
grade cement, if the strength is not less than 43N/mm2, it
is called 43 grade cement, and if the strength is not less
then 53 N/mm2, it is called 53 grade cement.

Is This Answer Correct ?    34 Yes 6 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

how can i calculate cement in brickwork

3460


Can a wave happen in the middle of the ocean like in the movie poseidon 2006?

691


What is the diff b/w ROAD TUNNEL & RAILWAY TUNNEL ??

1945


57. Calculate the volume of a truck loaded with stone chips whose data are as follows– 5 Top Length - 13-9, 13-10, 13-09 Bottom Length - 13-11, 13-10.5, 13-10 Top width - 8-7.5, 8-8, 8-7 Bottom width - 8-7, 8-8, 8-7.5 Depth - 2-0, 1-11.5, 1-10, 1-11, 1 -10.5, 1-11.75, 1-11

9049


Explain the latest method to detect a crack in a building?

676






factory shed foundation l=4, b=3' d=8' rcc foudation for top to bottom pl tell me cement ,steel ,sand ,labour cost ,excavtion,soil is weak not so hard

1665


i have applied 40mm spacer in the concrete for tie beam. is it correct? kindly give me if there any code available

1449


how to calculate the crushing strength of cement concrete paver blocks 100x100x60 mm thich.

1498


How is calculate the cube molt

1788


What is the quantity of metal 1 & metal 2 to be used in 100 cft concrete?

2600


What is the tallest man made structure in the world?

659


I have an plot with area 35*47 = 182.77 sq yards. Out of this iam planning to construct house with 1350 sqfeet each floor .iwanted to build a G+2 house.Need cost estimation for each item

1404


Write short note on construction programme for pile foundation.

4968


in levelling operation the first site on any change point is back site the second site on any change point is fore site the line commenses with fore sight & closes with backsight the line comensses with back sight & closes with fore sigh

1708


What is meant by engineering drawing?

658