Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

Does induction motor start with dc power supply????

Answer Posted / hardik tatamiya

Yes

Is This Answer Correct ?    3 Yes 8 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Is RTCC panel needs any control supply.

2051


how to put cable sizing and cable glands size for respective cable & Cable Lug size in a DB sectors???

2167


WILL SCHNEIDER MAKE ACB(MASTERPACT)TRIP ON REVERSE POWER?

2221


Why choke coil is connected in series with starter in tubelight??why starter is connected in parallel to tubelight??

3378


why you don not show protection and type of isolation in key single line diagram?

1979


Why the standard of ambient teperature mentioned as 40 degree celcius in machines.

1964


what is the use of Auto re-closer?

2145


hi, i finished b.tech eee in 2008, im worked in dg sets mfg company , now i left job in 6months back, now again i want get job core side, how can i get? is there any couses we have learn to get better oppurtunity? /

1964


What are the two segments of nyquist contour.

1108


any one can explain the stages of a knee point which is taken during ct magnetising curve.

1783


i need to now what will be the cable size to the following load, transformer to distribution panel distance 110m, load 1000kw, voltage 400v, pf 0.85, permissible voltage drop 2.0%, overhead line, atmospheric temperature 35 degree c.

1623


I am a possesor of c licence from 1993. I forgot to renew during the year 1998. During that time I was working at TNEB to till date. Is there any possibility to get renewed? or to apply for a new one?

2040


sir,in our plant we r using SATEC PM172E power reading meeters in HT panel side it is monitoring the MB data smart viewer(sever).but last one week we did not get readings inthe server only available in meeter.tell me how communicate meter and server. and also what steps we take for checking.

2228


On what basis the the size of Lightning arrester for buildings are selected ?

1651


why the active power flow of some line is increased when the active power of out is cut ?

2050