how to calculate rate analysis of M25 grade concrete
Answer Posted / amit dutta
m 25= 1:1:2.
there ore ratio is 1+1+2=4
we know one cub dry volume is 1.54.
there fore cement require,
1.54*1/4=0.385=11 bags cement for 1 cub m.
sand =0.3858*32.28cft = 12.45 for one cub m.
stone chip 0.77*32.28cft = 24.85 for 1 cub m.
| Is This Answer Correct ? | 58 Yes | 40 No |
Post New Answer View All Answers
Gidc technical que paper
Explain the benefits of using standard terminology in the measurement process?(Tendering and estimation)
i have applied 40mm spacer in the concrete for tie beam. is it correct? kindly give me if there any code available
what will be the cost of thickness of 125mmor rcc measurement of 52x33.75 feet
Is it necessary to apply tack coat over the primecoat. IF not what happens.answers other than 1.to superimpose the next layer(2) to adhere the layers so as to form homogenity.
what is the cost difference of a same structure when it is constructed with brick masonary and when it is constructed with block masonary and concrete as a frame structure????????????????????????
Explain major differences between routing maintenance and major maintenance.
Actually i am confused that how to calculate the bending moment for a semi-circular beam and curved slab.If any one have a good idea about the matter,please give the answer with a suitable example. Thank you......
Why the finite element method is lower bound solution?
What is the number of IS code of practice to be followed for hydraulic design of sewerage pipe line?
225 mm thick RCC slab, how many ton load slab can carry? for example if 33 ton truck loaded with soil, truck having 6 wheels. slab can take load or not? grade of concrete is M35 and slab design Fe500, slab desing one way slab.
How to calculate concrete in percentage wise ,for example cement 18% sand 40% aggregate 40% and Stell 2% ,I need and??
what is called the inverd level of mabhole chamber?
Please send me the qunty. of mason/labour required in each day for different type of civil construction work?please send me ans. in my mail.my mail id is (parthamitra086@gmail.com) or here.
How can calculate the requirement of steel bars of rcc slab for 1100 sq ft?