how to calculate rate analysis of M25 grade concrete
Answer Posted / amit dutta
m 25= 1:1:2.
there ore ratio is 1+1+2=4
we know one cub dry volume is 1.54.
there fore cement require,
1.54*1/4=0.385=11 bags cement for 1 cub m.
sand =0.3858*32.28cft = 12.45 for one cub m.
stone chip 0.77*32.28cft = 24.85 for 1 cub m.
Is This Answer Correct ? | 58 Yes | 40 No |
Post New Answer View All Answers
Cut Linten (RCC-1:2:4)on 10" wall - what should be the width and hight of cut Linten? Secondly, 1 X 1.6 foot,4" thick window sun/rain shed (Chajja)should consume steel,Cement, sand and Stone chips?
Dear sir, i want to NBCC & NTPC previous exam papers email Id : madhu_bingi@yahoo.co.in
what is the specific gravity of rubble in plum concert
what is E
what is the coefficient for running feet to cft coversion both area and price
cud any one send me tech quest paper(civil engg) at tarizus@yahoo.com
How to calculate chejja reinforcement
In block work seawalls what is the purpose of slip joints?
How is improve my knowledge in construction industries....
What is the worlds largest concrete dam?
States some of the tool bars used in cad?
How much area will be covered in 1 litre of Velvet touch paint in normal wall condition
Explain what is alternate bid?
How much permissible bearing capacity requires for open footings(isolated) and what type pile foundatuon prefering for coastal areas?
How to calculate carrying capacity of the existing water supply trunkmain