Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

what is the difference between weir and a barrage

Answer Posted / bharti sharma

if the major part or the entire ponding of water is achieved
by a raised crest and a smaller part or nil part of it is
achieved by a shutters,then this barrier is known as a weir.

if most of the ponding is done by gates and a smaller or nil
part of it is done by the raised crest,then the barrier is
known as a barrage.

Is This Answer Correct ?    7 Yes 3 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What should be the standard roof height like to be?

1209


1.Why we are preferring 43 grade cement than 53 grade cement. 2. Approximate cost difference between 43 and 53 grade cement. Thanks.

2714


What is meant by cad?

1035


If we are providing concrete joint in every 10m with water stopper in water tank wall then is it necessary to cut the steel at joint section?

1827


How much cements bag (or in KG) required for 1 Sq. M concrete, for M-30 grad concrete as per CPWD and where is thr proof on site

1697


all technical question

2268


What are some structures that may be subjected to fatigue?

1139


What are your future hopes for this job?

2303


how can calculate cutting length of diamond ring

1839


if i have to draw bending moment diagram of 4 way continous span then how to create it and how to find reaction?

1995


Special thing in designing a overhead reservoir ? which is different from an ordinary design

1227


What should be the maximum allowable time for placing ready mix concrete? The specification requires concrete placement within 90 minutes of batching at the plant. What is the significance of this 90 minutes & should this be used as a rejection criterion? What effects does the concrete has after that time period?

2858


Why do you want to work here

2357


how to identify the failure of building by expansive soils

1653


how many type of admixtures for water stored structure?

2124