What will be happend if we not ground CT secondary?
Answer Posted / dwara.55@gmail.com
If the secondary of the CT is not grounded or short circuited
then the secondary current will become zero hence the ampere
turns produced by secondary will oppose the ampere turns of
primary(i.e brings to zero). So, there is no counter m.m.f so
high flux is produced in the core thus overheating of core is
produced. Similarly high e.m.f will be produced both in
primary and secondary this will damage the insulation of
winding. Thus for safe operation for the operator the
secondary must be grounded properly
| Is This Answer Correct ? | 11 Yes | 2 No |
Post New Answer View All Answers
what is the maximim current drawn by 1 phase and three phase welding machine
What must be the distance between the Earth pit which are grounded from two different sources. Example: Distance between the earth pit for LV Panel-1 & 2
what is the affect of earth's magnetic field on the frequency used in aircraft???
What is the method for testing the differential protection stabilty in generator? When the time of starting What will happen if differentail protection connection wrong means?
A 50Hz,4-pole,3-phase,star-connected synchronous motor has a synchronous reactance of 12ohmsper phase and negligible armature resistances.the excitation is such as to give an open-circuit voltage of 13.2kilovolt.the motor is connected to 115kilovolt, 50hertz supplying. what maximum load can be the motor torque,line current and power factor?
What is transient Phenomenon?
what will be the maximum winding temperature of 6.6kv HT motor 450kw, Full load current 49A. 50Hz Frequency.
whatis the commertial spec. of distribution boards ?
In the formula : Knee point voltage = Burden X alf / class, Please inform what is alf? regards Shashidhar M.R.
What is the most accurate way of testing ELCB?ELCB is better than RCD?
Can Anyone suggest the Standards (IEC or IS) for selecting copper current density?
why we need to us lenz's law for synchornous motor
In the ACB breaker capacity is 2000Amp but this each phase taken 1250 But total beldibg load is 600amp or 700amp watt is the problem
why the check zone and main zone are used for Busbar Protn. scheem?
What is transformation ratio what it describes?