if my 6 kva UPS gives 20 min. backup at 100 % load, then at
25% load what is the backup time?
Answer Posted / prakash kusuma
at 25% load a 6kva UPS give back up of 50 min
as at 100% = 20 min ok
50% = 40 min
25% = 50 min (40 min + 20 min = 60 min(no load)
- 10 min(25 % load )= 50 min( back up)
Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
what is difference between fork type and capacitance type level switch. where it is using
Please any one can provide latest aptitude test,technical test and interview questions for tata consulting engineering (TCE) i need it asap thanks in advance
what should he know if he is an assitent engineer instrumentation in cement industries of experience of 10 - 15 year.
Calibration procedure for electro magnetic flow meter
what is the difference between Cv and air consumption? why the customer needs Air consumption details?
hi i am eswar i want to know the instrumentation interview questations for eil(engineers india ltd) i have applied for engineer post in eil please help in this.my mail id eswar310@gmail.com
what is stroke check for field instument transmetter's & AOV's
Specific gravity.
please send me the inteview questions in IOCL
can you send remote seal interface level transmitter calculation steps for oil water saperator.
What is stripper & spilitter ? Diffrence in this.?
What is the use of temprature compensation?
Give an example where you had aproblem on the job, and tell me how you solved the problem. and the finalvoutcome.
Square root calculation for dp flow transmitter?
Hi Friends i need Electronics&Instrumentation Engg question papers for BARC written test by coming 20th May 2008 pls post ur use full info to kkumarei@gmail.com. Or for suggestions pls give one missed call to 9962122264