Answer Posted / santosh kumar
The pavement in which no elastic property when aheavy
vehicle is moving on the road then it is cracked.No load
transfer layer to layer.rigid pavement is also known as
concrete pavement.
| Is This Answer Correct ? | 7 Yes | 1 No |
Post New Answer View All Answers
how much quantity of 1.5" nails and 2.5" nails are required for conventional formwork shuttering?
What is missing report and how to prepare
how pumping of concrete effects the quantity of material used in it?
Bitumen grades are 30-40,60-70, 80-100. what is mean by 30- 40
how to identify np3 pipe and np4 pipe
Explain the benefits of using standard terminology in the measurement process?(Tendering and estimation)
Need help in designing a degasser tower for 2m3/hr DM plant, also send me the formulae used
how much one carpenter can doing shuttering of slab in one day
How much is the cover for slab?
what is that one cub metre plaster in cemant and fine sand
what is modular brick and it size
Maximum cement content in 1cum for RCC and PSC? (please give IS,IRC referance?
Technical Question of Civil Engineering
Give me an example of a time when something you tried to accomplish and failed.
density of crush sand & crush stone or grit powder