How many minimum links need to be cut in a chain having 23
links to seperate it into single links
Answer Posted / sridhar ramachandran
I think its 11 cuts, i cut a ring i can seperate two ring
from the chain ( suppose i cut the second ring in the chain
i get 1st ring and second ring seperated from the chain.)
(1st ring cut and second ring cut , so its easy to seperate
them apart) similarily if i cut 10 rings i will get 20
rings removed from the chain(10 rings un cut and 10 rings
cut) remaining 3 rings together if i cut the middle ring
all three rings get seperated. So, i think 11 cuts would be
the minimum number of cuts needed.
| Is This Answer Correct ? | 8 Yes | 4 No |
Post New Answer View All Answers
sqrt(0.16)+cubic root(0.027) equals
WHAT IS THE NUMBER OF ZEROS AT THE END OF THE PRODUCT OF THE NUMBERS FROM 1 TO 100
Calculate the area of the triangle in square cm if a right angled triangle where the length of the shorter leg is one third of the length of its hypotenuse. And the length of the shorter leg is 7 cm.
If D is adjacent to F then who is adjacent to C?
The ratio of the length : breadth : height of a cuboid is 5 : 4: 3, and the volume is 7500. What will be its surface area ?
Alok and Bhanu play the following min-max game. Given the expression N = X - Y – Z where X, Y and Z are variables representing single digits (0 to 9), Alok would like to maximize N while Bhanu would like to minimize it. Towards this end, Alok chooses a single digit number and Bhanu substitutes this for a variable of her choice (X, Y or Z). Alok then chooses the next value and Bhanu, the variable to substitute the value. Finally Alok proposes the value for the remaining variable. Assuming both play to their optimal strategies, the value of N at the end of the game would be • 4 • -18 • 9 • 2
Why RSD of area limit is 15?
Find the next series: AE BH CM DU?
the probability of getting at least in a single through of three coins is
A student is ranked 13th from right and 8th from left. How many students are there in totality ?
12 men can build wall of length of 12m in 10 days how many men are required to build 20 m in 15 days.
how can i get previous ssc data entry question papers?... if u have any idea pls give me very kindly.....
0.512 * 18902358 =?
if 2x-y=4 then 6x-y is
there are two categories of persons in ratio a:b = 2:3. A type earns 2.5 dollars/hr and b type 1 dollar/hr total money earned by both is 24dollars. Then what is the total number of persons