how to calculate the runner (2*3) qty in cft. the length is 8 feet.
Answer Posted / sivaramkumar .k
0.33 cft
| Is This Answer Correct ? | 19 Yes | 5 No |
Post New Answer View All Answers
What is the thickness of slab for 600 sq each) 2 slab construction. What should be the size of steel rod?
Please tell me the quantity of cement, sand, flyash, foaming agent required for 1 cubic meter of cellular lightweight concrete blocks. also , is there any admixtures required for the CLC blocks production.
Describe the role of independent Quantity surveyor?
A Cat excavator loader of 3Lm*3 heaped capacity bucket is to be used to load blasted rock directly into a crusher of capacity (consumption) of 100L
How can we demolish concrete beams?
A super elevation of 60 cm has been provided on a 8m wide road and a curve of 260m radius .calculate the max.speed in km/hr of the vehicle that can be negotiated safely? Plz answer with full solution.thanx
Define What is the meaning of a blue land surveyors flag?
What is the procedure and technnology behind jointing of prestessed block in Delhi metro rail project.
Iwant to calculate the production of 1 labour for concrete casting which includes shuttering,scaffolding,steel fixing,concreting, deshuttering and curing in 8hours.But i am not able to determine it approximately would you pls.??
how we calculate the grade of the Bituminous materials.?????
use ofr concrete as per grade ?
How many square meter can a worker/labor demolish a structure per day?
PL.tell me about civil engineering questions with answer
Dear Sir What is the Contraction joint for base Slab
Explain what are the skills required to become an architect?