Answer Posted / sandeep kumar
1st Rl-last RL=rise-fall
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
percentage of metal,clay or soil & water in water bond macadam roads to know the quantities for each in total volume of 11500 cubic meters
what is the formula to find the sttel (bar)length in beam having bent up at l/4 t 45 degree & 60 degree.
What is the maximum crushing load in Kg & crushing strength in N/mm2 for M25 & M 15 Grade concrete
What is the formula for figuring out how many gallons of water are in a pipe by the foot?
Critical Path Method is...
The definition of national highway
how many digree of freedom in four bar chain
How to calculate the force on a column of three story building. What should be the base concrete height?.
how beam.coloum ,slab, footing are designed as per indian code.. detail procedure?
rate analysis for cement pointing 1:4 , for 100 sq m
how many type of admixtures for water stored structure?
Anyone have sample questions for bhel interview.please send me as Iam appearing for the interview on 19th sep2008. Kindly send this to my e-mail: arun_prasath_n@yahoo.co.in
How much wastages taken in 1. cement 2. steel 3. fine aggregate 4. coarse aggregates (10mm, 20 mm)
How can i do RCC rate analysis?
I am doing a engineering contract with GOI. I have purchased certain material from outside Maharashtra and paid CST on that material @ 5.25%. Please intimate whether I will be liable for VAT or VAT on works contract or not.