I'm puting roof slab M20 Design Concrete,Twoway slab how
many days wait for remooving of shuttering?
Answer Posted / osbert (civ eng. student maker
hi, you dont need to wait until concrete has finally set
which is at 28days, for grade 25 of concrete at 14 days it
will have obtained strength of 16.5N/mm2 when curing is done
well. still you dont need all that strength before removing
formworks, depending on the type of cement say for quick
hardening cement even 24 hours are enough, portland
pozzolana cement about 48-72 hours you can start removing
your formworks in case you need them for other purposes.
Note, the longer they stay the better, because when you
remove them early using rough methods you may slightly
destroy soft parts.
| Is This Answer Correct ? | 2 Yes | 3 No |
Post New Answer View All Answers
What is a projection line?
What is the biggest dam in america?
How to calculate volume of concrete & steel on tank foundation & ring wall ?
What is the l/d ratio of cantilever beam?
Why is concrete cube test carried out?
What is the method of soil replacement test?
how much concrete solid/hollow block are manufacture per 50 kg cement bag in differnent sizes like 400x200x200mm, 400x200x150mm, 400x200x100mm. And need proper ratio as per sale quantity. pls send my mail mathi7599@gmail.com searching last two years not yet get pls find and enclosed pls. need practical analysis.
How do you calculate reinforcement weight of steel?
How many square meter can a worker/labor demolish a structure per day?
Basic civil interview questionsÂ
Does VDF add strength to the flooring apart from preventing water ingress?
Special thing in designing a overhead reservoir ? which is different from an ordinary design
How to design 12*12*14 room having rrc slab ,coloum, beam,foundation?
what is the minimum cement content for M20 & M25 as per is code -456(2000).
Which is stronger solid steel rod or hollow steel pipe?